K9 All Systems is your local security company near Aberdeen with the knowledge and skill necessary to design a comprehensive solution for your company security needs.
Project Description: MCLANE ABERDEEN S2 CONVERSION & DPS 2024 Removed old Winpak Controllers and installed new Trove Nodes w/ S2 Mercury Controllers and Expansion Cards to take over existing Readers, Locks, Rex Devices, DPS. Installed conduit, boxes and cable for new Door Contacts and Sirens for Warehouse and Cooler for a total of 9 Doors. Each man door will have conduit from ceiling to door. Box and connectors for the DPS and Siren. Cable from the door to the nearest Trove with a input and output card. Installed 2 additional Troves to support DPS/Siren phase. INCLUDED: S2 Mercury controller S2 Mercury expansion cards S2 Input and output cards Trove nodes and power Data cable S2 licenses printer S2 licenses portals Door Contacts Cable Conduit Labor EXCLUDED: Expedited shipping. Physical door hardware (ie handles, hinges, door, frame, panic bars) Electronic hardware not listed in the included section (ie strikes, maglocks, gate locks, rex devices, readers, ex
Project Description: McLane Aberdeen Verkada Cameras 2024 REV 3 K9AS installed 32 total Verkada Cameras through this location. K9AS installed a new CAT6e cable to every Camera, terminated both ends, and tested the cable. K9AS installed 10 Exterior Cameras and 22 Interior Cameras. K9AS installed EMT Suspension Kits in the Warehouse to give Cameras better views. ***Customer to provide*** Network switch port numbers and locations
Project Description: MCLANE ABERDEEN ARMBAR URGENT REPAIR (INSURANCE CLAIM) Additional damage was discovered after initial insurance repair of the Pedestal, Intercom, Access Control. The existing armbar was leaking hydraulic fluid badly. Knine inspected the unit and discovered it was in a hyper retracted state due to the intial damage. The initial damage shorted wires as suspected and caused damage to the Control Board and Processor. The damage to those components then caused the Hydraulic Motor to run continuously in the open state which caused the Operator to damage internals that were not repairable. After talking with the manufacture, the only path to correction was replacement after disclosure of the nature of damage from the original incident. This proposal was to replace the Operator, Bar, and reform the base to accept the new Operator. Knine reused the Safety Beams, Open Sensors as they appeared to be operating normally and were not damaged by the initial incident.
Project Description: MCLANE ABERDEEN NETWORK BRIDGE UPGRADE Shipped new Gen Bridges, Mounts, and PoE Protectors to the facility. ATTN: Joe Robel INCLUDES: 4 Nanobeam GEN2 4 Mounts 4 POE Protectors Shipping EXCLUDES; Expedited shipping
Technician replaced the operator, bar and reformed the base to accept the new operator. He was able to reuse the safety beams, open sensors as they appeared to be operating normally and ere not damaged by the initial incident.